§ 16.16.540. Undergrounding of utilities—Exemptions—Required when.  


Latest version.
  • A.

    Existing facilities which are not within a subdivision and/or do not require improvement of public streets, can remain overhead with the exception of existing overhead lines and poles serving street lights only. These lines shall be placed underground and new concrete street lights installed.

    B.

    Subdivider shall be responsible for complying with the requirements of this section and Section 16.16.530 and the subdivider/owner shall make the necessary arrangements with the utility companies for the installation of and access to such facilities. The provisions of this section shall not apply to utility distribution facilities and lines which do not provide services to the area being subdivided.

(Ord. 1095 §5 (Exh. A (part)), 2003: Ord. 1094 §5 (Exh. A (part)), 2003).