§ 12.20.040. Postponement of improvements—Bonds required.  


Latest version.
  • Whenever it is deemed necessary by the city that it is in the best interest of the city and its inhabitants to defer the construction of the required curbs, gutters, sidewalks and driveway approaches to a later date because of the unavailability of grades from the office of the city engineer, incorporation of the area within an improvement district for the improvements, future planning, or for any other reasons approved by the city council, the owners of the property developed shall deposit with the city cash or bond to be written by a corporate surety company in the sum equal to fifteen dollars per lineal foot of curb and gutter and six dollars and seventy cents per lineal foot of sidewalks required by the provisions of Sections 12.20.010 through 12.20.080.

(Ord. 1095 §3 (Exh. A (part)), 2003: Ord. 1094 §3 (Exh. A (part)), 2003).